Skip navigation

Browsing by Author Sotskov, Y. N.

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
А Б В Г Д Е Ж З И Й К Л М Н О П Р С Т У Ф Х Ц Ч Ш Щ Ъ Ы Ь Э Ю Я
 
Showing results 2 to 19 of 19 < previous 
Issue DateTitleAuthor(s)
2010Measures of problem uncertainty for total weighted flow time scheduling on a single machineEgorova, N. G.; Sotskov, Y. N.; Werner, Frank; Tsung-Chyan Lai
2014Minimizing total flow time under uncertainty using optimality and stability boxesEgorova, N. G.; Sotskov, Y. N.; Werner, F.
2010Minimizing total weighted completion time with uncertain data: a stability approachEgorova, N. G.; Sotskov, Y. N.; Werner, Frank
2009Minimizing total weighted flow time of a set of jobs with interval processing timesEgorova, N. G.; Sotskov, Y. N.; Lai, T.-C.
2015Planning time-management as sequencing given jobs with interval processing timesEgorova, N. G.; Sotskov, Y. N.; Werner, F.
2009Schedule execution for two-machine flow-shop with interval processing timesEgorova, N. G.; Matsveichuk, N. M.; Sotskov, Y. N.; Lai, T.-C.
2006Sequence-dependent setup and removal times in a two-machine job-shop with minimizing the schedule lengthEgorova, N. G.; Sotskov, Y. N.; Lai, T.-C.; Werner, Frank
2008Sequence-dependent setup times in a two-machine job-shop with minimizing the schedule lengthEgorova, N. G.; Sotskov, Y. N.; Lai, T.-C.; Werner, Frank
2007Sequence-dependent setup times in a two-machine makespan job-shop scheduling problemEgorova, N. G.; Sotskov, Y. N.; Werner, F.
2008Sequencing jobs with uncertain processing times and minimizing the weighted total flow timeEgorova, N. G.; Sotskov, Y. N.
2018Single machine scheduling problem with interval processing times and total completion time objectiveSotskov, Y. N.; Egorova, N. G.
2018Single-machine scheduling with uncertain durations for optimizing service logistics with one truckSotskov, Y. N.; Egorova, N. G.
2014Stability polyhedra of optimal permutation of jobs servicingEgorova, N. G.; Sotskov, Y. N.
2017The optimality box in uncertain data for minimizing the sum of the weighted completion times of the given jobsSotskov, Y. N.; Lai, T.-C.; Egorova, N. G.; Werner, F.
2019The optimality region for a single-machine scheduling problem with bounded durations of the jobs and the total completion time оbjectiveSotskov, Y. N.; Egorova, N. G.
2011The stability box for minimizing total flow time under uncertain dataEgorova, N. G.; Sotskov, Y. N.; Tsung-Chyan Lai; Werner, Frank
2011The stability box in interval data for minimizing the sum of weighted completion timesEgorova, N. G.; Sotskov, Y. N.; Tsung-Chyan Lai; Werner, Frank
2018Минимизация суммы взвешенных моментов завершения обслуживания требований с интервальными длительностямиСотсков, Ю. Н.; Егорова, Н. Г.; Sotskov, Y. N.; Egorova, N. G.