Skip navigation

Browsing by Author Werner, Frank

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
А Б В Г Д Е Ж З И Й К Л М Н О П Р С Т У Ф Х Ц Ч Ш Щ Ъ Ы Ь Э Ю Я
 
Showing results 1 to 7 of 7
Issue DateTitleAuthor(s)
2010A stability approach for minimizing total weighted completion time with uncertain dataEgorova, N. G.; Sotskov, Y. N.; Werner, Frank
2010Measures of problem uncertainty for total weighted flow time scheduling on a single machineEgorova, N. G.; Sotskov, Y. N.; Werner, Frank; Tsung-Chyan Lai
2010Minimizing total weighted completion time with uncertain data: a stability approachEgorova, N. G.; Sotskov, Y. N.; Werner, Frank
2006Sequence-dependent setup and removal times in a two-machine job-shop with minimizing the schedule lengthEgorova, N. G.; Sotskov, Y. N.; Lai, T.-C.; Werner, Frank
2008Sequence-dependent setup times in a two-machine job-shop with minimizing the schedule lengthEgorova, N. G.; Sotskov, Y. N.; Lai, T.-C.; Werner, Frank
2011The stability box for minimizing total flow time under uncertain dataEgorova, N. G.; Sotskov, Y. N.; Tsung-Chyan Lai; Werner, Frank
2011The stability box in interval data for minimizing the sum of weighted completion timesEgorova, N. G.; Sotskov, Y. N.; Tsung-Chyan Lai; Werner, Frank