Issue Date | Title | Author(s) |
2010 | A stability approach for minimizing total weighted completion time with uncertain data | Egorova, N. G.; Sotskov, Y. N.; Werner, Frank |
2010 | Measures of problem uncertainty for total weighted flow time scheduling on a single machine | Egorova, N. G.; Sotskov, Y. N.; Werner, Frank; Tsung-Chyan Lai |
2014 | Minimizing total flow time under uncertainty using optimality and stability boxes | Egorova, N. G.; Sotskov, Y. N.; Werner, F. |
2010 | Minimizing total weighted completion time with uncertain data: a stability approach | Egorova, N. G.; Sotskov, Y. N.; Werner, Frank |
2009 | Minimizing total weighted flow time of a set of jobs with interval processing times | Egorova, N. G.; Sotskov, Y. N.; Lai, T.-C. |
2015 | Planning time-management as sequencing given jobs with interval processing times | Egorova, N. G.; Sotskov, Y. N.; Werner, F. |
2009 | Schedule execution for two-machine flow-shop with interval processing times | Egorova, N. G.; Matsveichuk, N. M.; Sotskov, Y. N.; Lai, T.-C. |
2006 | Sequence-dependent setup and removal times in a two-machine job-shop with minimizing the schedule length | Egorova, N. G.; Sotskov, Y. N.; Lai, T.-C.; Werner, Frank |
2008 | Sequence-dependent setup times in a two-machine job-shop with minimizing the schedule length | Egorova, N. G.; Sotskov, Y. N.; Lai, T.-C.; Werner, Frank |
2007 | Sequence-dependent setup times in a two-machine makespan job-shop scheduling problem | Egorova, N. G.; Sotskov, Y. N.; Werner, F. |
2008 | Sequencing jobs with uncertain processing times and minimizing the weighted total flow time | Egorova, N. G.; Sotskov, Y. N. |
2018 | Single machine scheduling problem with interval processing times and total completion time objective | Sotskov, Y. N.; Egorova, N. G. |
2018 | Single-machine scheduling with uncertain durations for optimizing service logistics with one truck | Sotskov, Y. N.; Egorova, N. G. |
2014 | Stability polyhedra of optimal permutation of jobs servicing | Egorova, N. G.; Sotskov, Y. N. |
2017 | The optimality box in uncertain data for minimizing the sum of the weighted completion times of the given jobs | Sotskov, Y. N.; Lai, T.-C.; Egorova, N. G.; Werner, F. |
2019 | The optimality region for a single-machine scheduling problem with bounded durations of the jobs and the total completion time оbjective | Sotskov, Y. N.; Egorova, N. G. |
2011 | The stability box for minimizing total flow time under uncertain data | Egorova, N. G.; Sotskov, Y. N.; Tsung-Chyan Lai; Werner, Frank |
2011 | The stability box in interval data for minimizing the sum of weighted completion times | Egorova, N. G.; Sotskov, Y. N.; Tsung-Chyan Lai; Werner, Frank |
2018 | Минимизация суммы взвешенных моментов завершения обслуживания требований с интервальными длительностями | Сотсков, Ю. Н.; Егорова, Н. Г.; Sotskov, Y. N.; Egorova, N. G. |